Demo workflow: production registration will include OTP, KYC and Rivon approval.
RIVON PARTNER NETWORK
Sign in securely to access your partner workspace.
Demo workflow: production registration will include OTP, KYC and Rivon approval.
Welcome back 👋
Track leads, projects, earnings and partner services from one place.
New customer enquiries
Site assessments
Proposals in progress
Active projects
5 kW • Residential • Noida
Survey Pending
3 kW • Residential • Ghaziabad
Proposal Sent
20 kW • Commercial • Hapur
New Lead
Amit Solar Solutions
POWER PARTNERFor eligible residential rooftop solar installations. Current central CFA structure provides ₹30,000/kW for the first 2 kW and ₹18,000 for the additional 1 kW, making the maximum standard CFA ₹78,000 for systems of 3 kW or above, subject to applicable scheme rules.
Residential consumers with a grid-connected electricity connection of the local DISCOM can apply through the National Portal, subject to scheme requirements.
Select state/DISCOM and register the residential electricity connection.
Submit the application and follow the feasibility/approval process applicable to your DISCOM.
Proceed with an eligible rooftop solar vendor and final system/site configuration.
Complete installation, inspection, net-meter requirements and commissioning as applicable.
Complete the required National Portal formalities and bank details for eligible subsidy processing.
Exact document requirements can vary by application stage, DISCOM and state. The production app should fetch the live checklist rather than treat this demo list as exhaustive.
Applicant should be an eligible residential electricity consumer / homeowner as required by the lender.
Bank assesses income, existing obligations, credit profile and repayment ability.
Property and rooftop should be suitable for the proposed residential solar installation.
System, vendor, quotation and portal requirements remain subject to the financing bank and scheme rules.
Aadhaar / PAN and other identity or address proof requested by the bank.
Latest electricity bill and consumer / connection details.
Bank statement, salary or income documents depending on applicant category and lender policy.
Vendor quotation, system details and PM Surya Ghar portal/application details where required.
For eligible residential rooftop solar, central CFA is ₹30,000/kW for the first 2 kW plus ₹18,000 for the next 1 kW, capped at ₹78,000 for systems of 3 kW or above.
Applies subject to scheme eligibilityShow Central CFA in quotations. Any additional state support should be confirmed from the National Portal / DISCOM at application time.
Show Central CFA in quotations. Verify any current additional state incentive with the relevant DISCOM / National Portal.
Show Central CFA in quotations. Verify any current additional state incentive before committing a subsidy amount.
Show Central CFA in quotations. Additional state support, where currently notified and applicable, should be verified for the consumer before quotation.
Show Central CFA in quotations. Verify additional state support and DISCOM-specific requirements at application time.
State/UT governments may supplement the Central Financial Assistance, but additional support is subject to current state notifications and National Portal integration. Rivon partners should verify the live portal/DISCOM position before promising a state subsidy.
Solar / renewable power projects under Component A, subject to the applicable implementing-agency, procurement and scheme conditions.
Standalone solar agriculture pumps for eligible beneficiaries in applicable areas, subject to state allocation and current scheme conditions.
Solarisation of eligible grid-connected agriculture pumps and feeder-level solarisation under the applicable state/DISCOM implementation model.
Eligibility depends on Component A, B or C and the current state implementing-agency window.
Land, agricultural electricity connection or project-site information may be required depending on the component.
Identity, address and bank details are commonly required; exact documents depend on the state process.
Application, quotation, technical and component-specific records should be collected as required by the implementing agency.
Check the current state implementing agency, allocation and component availability before committing a project.
Confirm current PM-KUSUM component availability, beneficiary conditions and application window.
Verify live state allocation and implementing-agency requirements for agricultural solar projects.
Confirm the applicable component, state window and agency requirements before quotation.
Verify current component availability and state implementing-agency requirements before commitment.
On-Grid Solar System
Create, preview, PDF & share
3 kW base price: ₹1,92,000 + applicable taxes. Final project value may change only where site conditions, scope or selected components change.
✓ Standard design, supply, installation and commissioning as specified in the quotation.
✓ Final technical configuration subject to site survey and engineering feasibility.
✓ Government subsidy is not deducted unless specifically stated and remains subject to consumer eligibility, portal/DISCOM approval and prevailing guidelines.
✓ Civil work, roof strengthening, major electrical modification, additional cable route, special structure, internet/network work and statutory charges are excluded unless expressly included.
PDF opens the browser print dialog — choose Save as PDF. WhatsApp shares the quotation summary and can be used immediately on mobile.
Partner hierarchy
Admin approval/activation will be connected to the final Rivon admin panel.
Procurement & tracking
Your project and equipment orders will appear here.
Partner payments
No outstanding dues in demo account
Demo only. Secure payment gateway will be connected in production.